Africa Data Centres’ second Cape Town data centre, CPT2, at Atlantic Hills on the northern edge of the city, designed as a 20 megawatt (MW) facility. Its parent, Cassava Technologies, uses it for its first NVIDIA-powered AI factory: graphics processing units (GPUs) were being installed there in late 2025, reportedly about 3,000 of the 12,000 Cassava bought, and Cassava said in May 2026 that the first deployment was in place.

Location
Operator
Site
Colocation · AI factory
Status
Operating 4 May 2026
Capacity
20 MW2023-01-25source ↗