Data centre site
AirTrunk JHB1 Johor
AirTrunk’s first Malaysian hyperscale campus, on 10.3 hectares in Johor Bahru, opened in July 2024 with initial phases of more than 50 megawatts (MW) and room to scale beyond 150 MW. It has an AI-ready design with direct-to-chip liquid cooling alongside indirect evaporative cooling, and was anchored by an unnamed large technology company.
- Location
- Operator
- Site
- Hyperscale
- Status
- Operating 30 Jul 2024
- Capacity
- 150 MW2023-01-19source ↗
- Customers
- EnterpriseWholesale
- Domains
- Data centres
Ecosystem
- No sourced relationships yet. A blank here is a fact about the evidence, not about the company.