Aligned Project Phoenix (Shippingport)
A 2 GW, three-facility data-centre campus that Aligned Data Centers broke ground on in September 2026 in the Shippingport Industrial Park, Beaver County, western Pennsylvania, with an estimated $10 billion of regional investment. It is to run on a dedicated on-site power source beside the former Shippingport coal power station, which is being redeveloped as a natural-gas energy campus, rather than drawing on the local grid.
- Location
- Operator
- Site
- Hyperscale
- Status
- Under construction 10 Sept 2026
- Capacity
- 2,000 MW2026-09-10source ↗
- Customers
- EnterpriseWholesale
- Domains
- Data centres
Ecosystem
- No sourced relationships yet. A blank here is a fact about the evidence, not about the company.