Data centre site
Campus IA Fouju
AI computing campus at Fouju, Seine-et-Marne, south-east of Paris, owned by a joint venture of MGX, Bpifrance (the French public investment bank), NVIDIA and Mistral AI. RTE, the French grid operator, will connect 240 MW by the end of 2027 and 700 MW before the end of 2029, with the connection designed to reach 1,400 MW; the company gives 2028 for first operation.
- Location
- Operator
- Site
- AI factory
- Status
- Under construction Sept 2026
- Capacity
- 1,400 MW2026-01-26source ↗
- Customers
- EnterpriseWholesale
- Domains
- Data centresAI infrastructure