Data centre site
Fermaca Digital City, Durango
Planned AI data-centre campus at Durango, northern Mexico, to be built and run by the Fermaca group with NVIDIA technology and its own natural-gas power: a 350 megawatt (MW) combined-cycle plant fed by a 160-kilometre pipeline from Texas. It has been announced at 250 MW in five 50 MW stages; Fermaca now calls it a long-term ambition of up to 1 gigawatt of IT capacity.
- Location
- Operator
- Site
- AI factory
- Status
- Planned 4 Nov 2026
- Capacity
- 250 MW2026-05-25source ↗
- Customers
- EnterpriseWholesale
- Domains
- Data centresAI infrastructure
Ecosystem
- No sourced relationships yet. A blank here is a fact about the evidence, not about the company.