Data centre site
Firmus Batam AI Factory
AI factory campus on Batam island, Indonesia, south of Singapore, built on NVIDIA’s DSX reference design and developed with DayOne, which is constructing the facility and in which Firmus rents space for its own NVIDIA systems. Firmus states 360 megawatts (MW) for the campus.
- Location
- Operator
- Site
- AI factory
- Status
- Under construction 29 Jun 2026
- Capacity
- 360 MW2026-06source ↗
- Customers
- EnterpriseWholesale
- Domains
- Data centresAI infrastructure
Ecosystem
- No sourced relationships yet. A blank here is a fact about the evidence, not about the company.