Skip to main content
BSS/OSS Academy

Data centre site

Global Switch London East

An 87 MW site in the Docklands fibre cluster with liquid cooling for AI and HPC halls; CoreWeave’s second UK deployment went live here in December 2024. London North (18 MW) and London South (70 MW) complete the campus.

Location
Operator
Site
Colocation · AI factory
Status
Operating 18 Sept 2026
Capacity
87 MW2026-09-18source ↗
Tenants
CoreWeave
Customers
EnterpriseWholesale
Domains
Data centresAI infrastructure

Ecosystem

  • No sourced relationships yet. A blank here is a fact about the evidence, not about the company.

Open Global Switch London East on the map →