Stargate UAE (UAE–U.S. AI Campus)
A one-gigawatt AI compute cluster inside the planned five-gigawatt UAE–U.S. AI Campus in Abu Dhabi, built by Khazna Data Centers (a G42 company) under G42’s lead, to be operated by OpenAI and Oracle on NVIDIA GB300 systems, with OpenAI as the customer. Phase 1 is 200 MW, due in the third quarter of 2026; no source read confirms it live. In September 2026 Reuters reported that the wider campus was being redrawn into several dispersed sites after Iranian attacks; G42 said work was progressing as planned.