Data centre site

Stargate UAE (UAE–U.S. AI Campus)

A one-gigawatt AI compute cluster inside the planned five-gigawatt UAE–U.S. AI Campus in Abu Dhabi, built by Khazna Data Centers (a G42 company) under G42’s lead, to be operated by OpenAI and Oracle on NVIDIA GB300 systems, with OpenAI as the customer. Phase 1 is 200 MW, due in the third quarter of 2026; no source read confirms it live. In September 2026 Reuters reported that the wider campus was being redrawn into several dispersed sites after Iranian attacks; G42 said work was progressing as planned.

Location
Operator
Site
AI factory · Hyperscale
Status
Under construction 12 Sept 2026
Capacity
1,000 MW2025-05-22source ↗
Tenants
OpenAI
Customers
EnterpriseWholesale
Domains
Data centresAI infrastructure

Ecosystem

  • No sourced relationships yet. A blank here is a fact about the evidence, not about the company.

Open Stargate UAE (UAE–U.S. AI Campus) in the ecosystem →