LG Uplus’s AI data center campus in Paju, north of Seoul, on land bought from LG Display: a 200 MW site (confirmed power supply) that the company calls the largest inference-focused AI data center in the Seoul metropolitan area, with hybrid air and direct-to-chip liquid cooling. Building 1 (about 50 MW, about 30 MW of IT load) is due in June 2027 and is fully leased; in July 2026 LG Uplus approved about KRW 1.3 trillion for Buildings 2 and 3, with Building 4 in design.
- Location
- Operator
- Site
- Colocation · AI factory
- Status
- Under construction 29 Jul 2026
- Capacity
- 200 MW2026-06-07source ↗