Nexus AI Factory, Nouaceur
Planned AI data centre on a 20-hectare plot at Nouaceur, outside Casablanca, the first phase of Nexus Core Systems’ Nexus AI Factory for Morocco, with NVIDIA Blackwell systems, Naver Cloud running the AI platform and renewable power from TAQA Morocco. The Nouaceur phase is reported at 16 megawatts (MW) of IT load, with a 20 MW second phase at a site in northern Morocco and an aim of 500 MW in the long run.
- Location
- Operator
- Site
- AI factory
- Status
- Planned 8 Oct 2026
- Capacity
- 16 MW2026-04-13source ↗
- Customers
- EnterpriseWholesale
- Domains
- Data centresAI infrastructure