QTS Cambois

QTS’s first UK campus, on the former Blyth power station site at Cambois, Northumberland, in the North East AI Growth Zone: ten buildings, about 540,000 m², up to £10bn, financed through Blackstone’s Renaissance Land. Reported at about 720 MW if fully built. Site preparation had begun by April 2026, with piling for the first building due that spring.

Location
Operator
Site
Hyperscale
Status
Under construction 14 Apr 2026
Capacity
720 MW2026-04-14source ↗