Data centre site
QTS Cambois
QTS’s first UK campus, on the former Blyth power station site at Cambois, Northumberland, in the North East AI Growth Zone: ten buildings, about 540,000 m², up to £10bn, financed through Blackstone’s Renaissance Land. Reported at about 720 MW if fully built. Site preparation had begun by April 2026, with piling for the first building due that spring.
- Location
- Operator
- Site
- Hyperscale
- Status
- Under construction 14 Apr 2026
- Capacity
- 720 MW2026-04-14source ↗