Rack Centre Lagos campus (LGS1 and LGS2)

Carrier-neutral Tier III colocation campus on the Lagos mainland. Its second building, LGS2, a 12 megawatt (MW) IT-load data centre with six 2 MW halls and racks of up to 70 kilowatts, was commissioned in April 2025, taking the campus to 13.5 MW of IT power on a 25 MVA utility supply.

Location
Operator
Site
Colocation
Status
Operating 10 Apr 2025
Capacity
13.5 MW2025-04-10source ↗
Customers
EnterpriseWholesale
Domains
Data centres

Ecosystem

  • No sourced relationships yet. A blank here is a fact about the evidence, not about the company.