Rack Centre Lagos campus (LGS1 and LGS2)
Carrier-neutral Tier III colocation campus on the Lagos mainland. Its second building, LGS2, a 12 megawatt (MW) IT-load data centre with six 2 MW halls and racks of up to 70 kilowatts, was commissioned in April 2025, taking the campus to 13.5 MW of IT power on a 25 MVA utility supply.