Data centre site
Racks Central Johor AI campus, Pasir Gudang
Campus of AI data centres being built by Singapore’s Racks Central at Pasir Gudang, Johor, designed for liquid-cooled graphics processing unit (GPU) clusters. The company gives target IT loads of 90 megawatts (MW) for RCJM1 and 175 MW each for RCJM2A and RCJM2B; trade press reports 510 MW for the whole campus.
- Location
- Operator
- Site
- AI factory · Colocation
- Status
- Under construction 29 Jun 2026
- Capacity
- 510 MW2026-06-30source ↗
- Customers
- EnterpriseWholesale
- Domains
- Data centresAI infrastructure
Ecosystem
- No sourced relationships yet. A blank here is a fact about the evidence, not about the company.
Open Racks Central Johor AI campus, Pasir Gudang in the ecosystem →