Switch Citadel Campus (Tahoe Reno)
Switch’s colocation campus in the Tahoe Reno Industrial Center, Nevada, anchored by Tahoe Reno 1 (1.3 million sq ft, opened 2017). In 2020 Switch said the campus could expand to over 600 MW of power capacity; its current page says ’gigawatts’ without giving a number.
- Location
- Operator
- Site
- Colocation · Hyperscale
- Status
- Operating 15 Feb 2017
- Capacity
- 600 MW2020source ↗
- Customers
- EnterpriseWholesale
- Domains
- Data centres
Ecosystem
- No sourced relationships yet. A blank here is a fact about the evidence, not about the company.