Switch’s original multi-tenant campus in Las Vegas, home of its LAS VEGAS 8–10 and later buildings, linked to its Citadel Campus near Reno by dedicated fibre. When LAS VEGAS 10 opened in 2017, Switch put the campus at over 2 million square feet with up to 315 MW of power, with 10 of 12 projected buildings built.
- Location
- Operator
- Site
- Colocation
- Status
- Operating 16 Jun 2017
- Capacity
- 315 MW2017-06-16source ↗