Data centre site

Telecom Egypt Regional Data Hub (RDH), Smart Village

Telecom Egypt’s carrier-neutral Regional Data Hub, built near the subsea cables that land in Egypt. The first phase, RDH 1, opened in 2021 with 2.5 megawatts (MW) of IT load and was full within a year; RDH 2, at about 4.6 MW of IT load, was due by the end of 2025 but its opening has not been confirmed. Telecom Egypt dropped a planned sale of the business to Helios in July 2026 and is carving it out as a wholly owned subsidiary.

Location
Operator
Site
Colocation
Status
Operating 17 Jul 2026
Capacity
2.5 MW2024-11-18source ↗
Customers
EnterpriseWholesale
Domains
Data centres

Ecosystem

  • No sourced relationships yet. A blank here is a fact about the evidence, not about the company.

Open Telecom Egypt Regional Data Hub (RDH), Smart Village in the ecosystem →