Data centre site

NeutraDC Nxera Batam (BTM-1)

Hyperscale campus in the Kabil Industrial Estate, Batam, run by NeutraDC Nxera Batam, a joint venture of Telkom Indonesia’s data-centre subsidiary NeutraDC and Singtel’s Nxera with Medco Power. The first building, BTM-1 (18 MW IT load initially, scalable to 54 MW), topped out in October 2025 and was fully committed before launch; Telkom describes a 100 megawatt (MW) campus.

Location
Operator
Site
Hyperscale · Colocation
Status
Under construction 9 Jun 2026
Capacity
100 MW2026-06-09source ↗
Tenants
Gorilla Technology
Customers
EnterpriseWholesale
Domains
Data centres

Ecosystem

  • No sourced relationships yet. A blank here is a fact about the evidence, not about the company.

Open NeutraDC Nxera Batam (BTM-1) in the ecosystem →