Teraco Isando Campus (JB1/JB3/JB5, JB7 under construction)

Teraco’s original carrier-neutral campus east of Johannesburg, where its head office is. It runs about 70 MW of critical load today (as reported), and the 40 MW JB7, due in 2026, would take the campus to 110 MW.

Location
Operator
Site
Colocation · Hyperscale
Status
Operating 12 Aug 2025
Capacity
110 MW2024-11-13source ↗