Data centre site
YTL Green Data Center Park, Kulai
Renewable-powered data centre campus in Kulai, Johor, with colocation halls and YTL’s NVIDIA GB200-based AI data centre (YTL AI Cloud), operational since late 2025. Planned capacity was doubled to 1.2 GW in June 2026; 298 MW is contracted.
- Location
- Operator
- Site
- Colocation · AI factory
- Status
- Operating 31 Oct 2025
- Capacity
- 1,200 MW2026-06-25source ↗
- Customers
- EnterpriseWholesale
- Domains
- Data centresAI infrastructure
Ecosystem
- No sourced relationships yet. A blank here is a fact about the evidence, not about the company.