Vantage Cardiff (CWL1)

A 148 MW campus on 46 acres with its own 400 kV substation on the UK SuperGrid; two of three buildings operating, racks up to 125 kW+.

Location
Operator
Site
Hyperscale · Colocation
Status
Operating 18 Sept 2026
Capacity
148 MW2026-09-18source ↗