Data centre site
atNorth ICE02 (Keflavík)
An 83 MW Tier 3 campus by Keflavík airport on geothermal and hydro power, built for 40 kW average racks with 100 kW+ liquid-cooled options for AI and HPC.
- Location
- Operator
- Site
- Colocation · AI factory
- Status
- Operating 18 Sept 2026
- Capacity
- 83 MW2026-09-18source ↗
- Customers
- EnterpriseWholesale
- Domains
- Data centresAI infrastructure