Data centre site
Global Switch London East
An 87 MW site in the Docklands fibre cluster with liquid cooling for AI and HPC halls; CoreWeave’s second UK deployment went live here in December 2024. London North (18 MW) and London South (70 MW) complete the campus.
- Location
- Operator
- Site
- Colocation · AI factory
- Status
- Operating 18 Sept 2026
- Capacity
- 87 MW2026-09-18source ↗
- Tenants
- CoreWeave
- Customers
- EnterpriseWholesale
- Domains
- Data centresAI infrastructure
Ecosystem
- No sourced relationships yet. A blank here is a fact about the evidence, not about the company.