Vantage Cardiff (CWL1)
A 148 MW campus on 46 acres with its own 400 kV substation on the UK SuperGrid; two of three buildings operating, racks up to 125 kW+.
- Location
- Operator
- Site
- Hyperscale · Colocation
- Status
- Operating 18 Sept 2026
- Capacity
- 148 MW2026-09-18source ↗